B22 PIPING PLAN HYDROCARBON PUMP

FRIEDLANDER

B22 Piping Plan Hydrocarbon Pump

2022


UPN calculation note for TYPE SP2;TYPESP3;TYPE SP4 media 

Program TYPE SP2;TYPE SP3;TYPE SP4 media:

  • ISO drawing 1 Discharge connection from Super line to B22 (incl. MTO, BOM and soldering card); 
  • ISO drawing 2 Super suction line connection to pump room (including MTO, BOM and Welding menu); 
  • ISO drawing 3 Weir connection on C2 line (including MTO, BOM and welding drawing); 
  • ISO drawing 4 Foam box connection to premix network (including MTO, BOM and welding drawing); 
  • ISO drawing 5 Connection box foam on premix network (including MTO, BOM and welding drawing).

Client: Friedlander

FIRE FIGHTING SYTEM CONNECTION
TOTAL ENERGIES