UPN calculation note for TYPE SP2;TYPESP3;TYPE SP4 media
Program TYPE SP2;TYPE SP3;TYPE SP4 media:
- ISO drawing 1 Discharge connection from Super line to B22 (incl. MTO, BOM and soldering card);
- ISO drawing 2 Super suction line connection to pump room (including MTO, BOM and Welding menu);
- ISO drawing 3 Weir connection on C2 line (including MTO, BOM and welding drawing);
- ISO drawing 4 Foam box connection to premix network (including MTO, BOM and welding drawing);
- ISO drawing 5 Connection box foam on premix network (including MTO, BOM and welding drawing).
Client: Friedlander