CORRECTION PAVING
WAREHOUSE FLOOR
2022
Following the renovation of a hangar, Oleosen reinforced the existing footings because the building had to be raised. At the end of the works, during the operation of the structure, premature deterioration appeared: cracking of the screed on the slab, subsidence under the effect of the load in the forklift passageways, mainly in the area of the eccentric footings. In view of the gradual deterioration of the slab, a 513m2 area was resurfaced. However, a sudden subsidence revealed that, contrary to their expectations, the work had not been carried out with the requisite technical skill.
WISE-LAB was contacted to correct the paving by carrying out :
- A detailed analysis of the excavated areas located in the axis of the footings, according to the plan and sounding;
- A technical recommendation for levelling the paving in line with the final industrial use: rack storage and lifting equipment.
Client: Oleosen