ELECTRICAL POWER STATION CONSTRUCTION PROJECT

SOCOCIM INDUSTRIES

ELECTRICAL POWER STATION CONSTRUCTION PROJECT 

2022-2023

Design and sizing of a transformer substation for SOCOCIM. In this project, WISE-LAB's mission is to :

  • Dimensioning the slabs on which the transformers will be installed (slabs supported on piles);
  • Design a firewall separating the two transformers (deep foundations);
  • Sizing of the drawing chambers and channels for the electrical network;
  • Sizing of transformer substation enclosure wall (deep foundations);
  • Drawing up a technical specification.

 Client: SOCOCIM