UPGRADE OF FIRE
PROTECTION NETWORKS
AT 3 SITES (MBAO, PB AND PN)
2023 –2024
The mission concerns the three SENSTOCK sites below:
- The SENSTOCK MBAO FIRE PROTECTION system includes 2 FIRE PROTECTION tanks of 10,000 m3 and 3,000 m3, a pumping station and the FIRE PROTECTION distribution network in accordance with master plan MB-04-SENSTOCK-DEPOT MBAO-RESEAU FIRE PROTECTION-E and PID MB-14-SENSTOCK-DEPOT MBAO-PID-FIRE PROTECTION-A;
- SENSTOCK's FIRE PROTECTION system for the PRODUIT BLANC depot includes 1 FIRE PROTECTION tank, a pumping station and the FIRE PROTECTION distribution network in accordance with master plan PB-30-RESEAU FIRE PROTECTION and PID PB-14B-SENSTOCK-DEPOT PRODUIT BLANC-PID FIRE PROTECTION;
- SENSTOCK’s FIRE PROTECTION system for the BLACK PRODUCT depot includes offshore suction, pumping and the FIRE PROTECTION distribution network according to master plan 221437-02-SENSTOCK-PN-REFONTE FIRE PROTECTION-PID-PROJET-B.
With this mission, SENSTOCK wishes to verify the possibilities of modifications to be made to the existing networks following :
- Increase in equipment;
- Pressure losses;
- Necessary flow rates;
- Maintaining the network pressurized to 12 bars.
It consists of :
- Conducting an audit of existing networks by determining;
- Integrate modifications to be made to existing networks according to the attached memo to improve our FIRE PROTECTION and meet POI recommendations.
Client: SENSTOCK